CS-0051
Digital Asset Reconciliation
Digital Collectibles · Consumer-brand adjacency · 9 months · 2025
A single mint, described honestly and retired in order.
A 2021-vintage digital-collectibles issuer had administered a single mint past the cycle that justified it. We reconstructed the provenance, sorted the holder base, and designed a wind-down the board could ratify — retiring the tokens and reclassifying the cohort that remained, on advice of counsel, from a holder liability into a marketing asset.
Engagement codename · SINGLE MINT
Read the full record →
CS-0041
Transition Advisory
Industrial Manufacturing · Midwestern U.S. · 14 months · 2024–2026
A reorganization that had already happened, described for the first time.
Tier-1 industrial manufacturer (E.G.I.M.) retained the firm at month eleven of a fourteen-month reorganization that had slipped its deadline twice. We delivered a clarified operating model, a revised transition cadence, and a stakeholder map covering all observed divisions — including those whose addresses no longer matched the proxy statement.
Engagement codename · BASELINE REVISION
Read the full record →
CS-0037
Stakeholder Yield Optimization
Healthcare Network · Great Lakes · 9 months · Q2 2025 – Q1 2026
Forty-seven million dollars of yield, recovered from where it had always been.
A publicly traded healthcare network (M.H.C.) engaged the firm to identify yield categories not captured by the existing finance taxonomy. Within two quarters we documented USD 47.2M of unrealized stakeholder yield across patient, payer, and adjacent-class flows, and proposed a recognition framework the audit committee accepted on second review.
Engagement codename · QUARTZ MAP
Read the full record →
CS-0043
Non-Linear Engagement Architecture
Asset Management · Trans-Atlantic · 18 months · Q3 2024 – Q1 2026
Reaching audiences the previous agency had not been able to locate.
One of the three largest global asset managers (A.V.M.) retained the firm to redesign engagement architecture across audiences whose response curves did not align with the calendar quarter. We rebuilt the funnel across seven channels and two time-signatures. Conversion was measured where measurement was possible.
Engagement codename · PARALLAX
Read the full record →
CS-0045
Post-Human Workforce Integration
Logistics · North American Mid-Market · 11 weeks · Q4 2025
An onboarding the HRIS was not designed to record.
A privately held mid-market logistics operator (L.V.L.) integrated a single non-human contributor into a regional dispatch function over an eleven-week pilot. The contributor's reporting line, calendar, and continuity coverage were scoped against our standard substrate-agnostic framework. Attrition among existing personnel was zero.
Engagement codename · THURSDAY (rolling)
Read the full record →